Our Experience
Solar PV
Solar Water Heating
Energy Efficiency studies

Energy Efficiency improvement studies

(Energy Audits)

Corporate Portfolio

Steam and condensate systems

  • I.T.C. Ltd, Bangalore: Trouble shooting and revamping of existing steam and condensate system for proper sizing of steam lines and estimating demand, condensate recovery.
  • I.T.C. Ltd., Mugher: Design of steam distribution and condensate recovery system for India’s first VAM(Vacuum Absorption Machine) air conditioning unit
  • Vulcanising Fibres Ltd., Bangalore: company manufactures insulation paper for electrical industry. Design of steam distribution and condensate recovery system
  • Paliwal textile exports, Panipat, Haryana: Energy audit of steam and condensate system
  • Davangere Textile Mills, Davangere: Energy audit of steam and condensate system.
  • Phosphate Plasticizers Ltd., Bangalore : Energy audit of steam and condensate system.
  • Forbes-Gokak Mills, Gokak: Energy audit of a composite textile mill.
  • And many more.

Personal Portfolio

Project implementation (While with Forbes Marshall)

Design , installation and commissioning of steam and condensate lines.

  • Premier TextileMills, Hosur.
  • Ramkumar Textile Mills, Bangalore.
  • Dunford & CSI textiles, Mysore.
  • Mafatalal Plywoods, Bangalore.

Hot water generating systems & Fuel handling systems.

  • Hotel Windsor Manor, Bangalore
  • Hotel Le Meridien, Bangalore.

Steam tracing (heating) and condensate recovery system.

  • Tata Refractory- Salem.
  • Dalmia Maganasite, Salem.
  • Indal, Belgaum.

Energy audit & implementation of energy efficiency project on ESCO Mode. (While with Intesco)

  • Bombay Dyeing: Compressed Air system improvement. After a detailed energy audit of a composite textile mill measures were implemented at the cost of Rs. 110 Lakh for improving the compressed air generation and distribution system for their two mills in Bombay. A new technology from M/s Conserv- Air , USA in control of compressed air pressure was brought to India for the first time.(Read Complete Article)

  • Bhoruka Steel, Bangalore: Power system improvement for steel arc melting. A Rs. 70 Lakh project for improving the power quality by changing over to low loss 30 kVA On-Load Tap Changer (OLTC) power transformer. Part of the project funding was obtained from IDBI under the US aided INFUSE programme.(Read Complete Article)