Case Studies
ITC- IRC, Bangalore
Indian Institute of Science, Bangalore
Forbes-Gokak Mills, Gokak
Wells Fargo

ITC- IRC, Bangalore

    A newly set up R& D centre in Bangalore for carrying trials on tobacco processing was not getting sufficient amount and quality of steam. On carrying out an audit it was found to have wrong design in boiler selection, distribution etc. Recommendations were suggested which improved the situation considerably.

  • read more

Indian Institute of Science, Bangalore

    The new Boys’ hostel was installed with a solar water heating system of high capacity. However, right from day one it had several issues and did not meet the requirements. A study was carried out and system was decentralized alongwith other measures. This resulted in 24X7 availability of hot water with minimal wastages.

  • read more

Forbes-Gokak Mills, Gokak

    The mill had a total energy bill of Rs. 92 million per annum in the form of coal and electricity. An energy audit conducted at the textile processing unit. An energy audit conducted identified various measures leading to savings of Rs. 2 Million having an average payback of 1.2 years.

  • read more

Wells Fargo

    Wellsfargo is a wellknown banking organization Head quartered in USA. They have some operations in India. For their Bangalore unit, the company decided to go have some portion of their total power requirements from solar power

  • read more